A tight squeeze in South Cave.

An interesting PIV installation this morning in South Cave. The customer wasn’t at all sure it would be possible to fit it in. But the installation actually went pretty well with a pretty neat look on the landing ceiling.

Previous
Previous

Do the tissue test..!

Next
Next

Email Troubles (temporary)